In brief
A bill of materials (BOM) is the complete, structured list of all components, raw materials and subassemblies, including quantities, needed to manufacture a product.
What a bill of materials is for
The bill of materials is a product’s recipe. From it, the workshop works out what it needs to prepare, purchasing what it needs to order, and costing what a part costs. If a screw is missing from the bill of materials, it will be missing from the warehouse later too – usually right when the order should be finished.
Depending on the department, the bill of materials looks a little different. Engineering thinks in functions and drawings, production in work steps and the material that has to be ready at the workstation. That’s why many businesses distinguish between an engineering BOM and a manufacturing BOM.
Retailers and service providers know the principle too: a set of several items, an assembly package or a service kit is basically a small bill of materials. If you store it in the system, you don’t have to piece together what belongs to it for every order.
Single-level, multi-level, variants
The specialist literature distinguishes several basic forms:
- Summarized BOM: all parts of a product with their total quantity, without structure
- Indented BOM: shows all levels, i.e. which parts go into which subassembly
- Single-level BOM: describes only one level, each subassembly has its own bill of materials
- Variant BOM: groups similar products together, such as a piece of furniture in three widths and two colors
Multi-level bills of materials in practice
It gets multi-level as soon as a product contains semi-finished goods: a cabinet consists of a carcass, doors and fittings, and the carcass in turn of panels, edging and dowels. Each subassembly has its own bill of materials, and the top one refers to the ones below. If a subassembly changes, you update it in one single place.
A bill of materials is only as good as its upkeep, though. If engineering changes a component, the workshop has to work with the new version right away, and yet it should stay traceable which version a delivered part was built to. Just as important are clean units such as pieces, meters or kilos and a realistic allowance for waste. Otherwise neither the material requirements nor the costing will be right.
Bills of materials in Odoo
In Odoo, bills of materials are part of Odoo Manufacturing. A bill of materials contains the components with quantities and, if you like, the operations with work center, standard time and work instructions. For each component you can define which product variants it applies to, so a single bill of materials covers all versions. Semi-finished goods get their own bills of materials, and Odoo creates the manufacturing orders for them through reordering rules or routes. A product’s production cost can be calculated from the components and operations in the bill of materials.
There are also kit BOMs, which let you sell several items as a set, and bills of materials for subcontracted manufacturing. If you want to release changes in a controlled way, you version bills of materials with Odoo PLM. Material requirements planning calculates the material needs across all bills of materials, and inventory management keeps track of the components themselves.
Frequently asked questions about bills of materials
Your question isn’t here? Ask us directly – the initial consultation is free and without obligation.
What does BOM mean?
BOM stands for bill of materials, called “Stückliste” in German. The English abbreviation is also widespread in German-speaking countries, especially in industry and in ERP software.
What is the difference between a bill of materials and a routing?
The bill of materials says what a product is made of, the routing in which steps and at which work centers it is made. In Odoo, both are stored in the same bill of materials: components and operations.
What is a variant BOM?
A variant BOM describes several similar products together, for example a table in different sizes. Shared parts appear once, variant-specific parts apply only to the respective version.